Environmental Assessment for the Proposed Construction, Operation, and Maintenance of Tactical Infrastructure, U.S. Border Patrol , El Centro Sector, California
Language: en
Pages:
Environmental Impact Statement for Construction, Maintenance, and Operation of Tactical Infrastructure, Rio Grande Valley Sector, Texas
Language: en
Pages:
Authors: U.S. Customs and Border Protection
Categories: Environmental impact analysis
Type: BOOK - Published: 2007 - Publisher:

GET EBOOK

"CBP proposes to construct, maintain and operate approximately 70 miles of tactical infrastructure, including pedestrian fencing, patrol roads, and access roads
Environmental Assessment Addressing the Proposed Construction, Operation, and Maintenance of a U.S. Border Patrol Station, Detroit, Michigan
Language: en
Pages:
Authors: United States. Department of Homeland Security
Categories: Border stations
Type: BOOK - Published: 2012 - Publisher:

GET EBOOK

The Proposed Action is to construct, operate, and maintain a new U.S. Border Patrol (USBP) station in Detroit, Michigan.