Runway Visual Range (RVR) Operational Test and Evaluation (OT & E) Integration and OT & E Operational Test Report

Runway Visual Range (RVR) Operational Test and Evaluation (OT & E) Integration and OT & E Operational Test Report
Author: William E. Benner
Publisher:
Total Pages: 83
Release: 1993
Genre:
ISBN:

Download Runway Visual Range (RVR) Operational Test and Evaluation (OT & E) Integration and OT & E Operational Test Report Book in PDF, Epub and Kindle

The Operational Test and Evaluation (OT and E) Integration and OT and E Operational testing of the Runway Visual Range (RVR) was conducted at the Kansas City International (MCI) Airport Traffic Control Tower (ATCT) in Kansas City, MO, and at the Kansas City (ZKC) Air Route Traffic Control Center (ARTCC) in Olathe, KA. The purpose of this test was to verify National Airspace System (NAS) integration requirements of the subsystems and the operational effectiveness of the RVR within the NAS environment. This report addresses the results of OT and E testing and the results of integration and operational testing of the RVR Maintenance Data Terminal (MDT) and RVR/ Maintenance Processing System (MPS) interface requirements. Testing of the Tower Control Computer Complex (TCCC) and the Automated Surface Observation System (ASOS) NAS subsystems was deferred. It was concluded that the New Generation RVR requires corrections and/or modifications to satisfactorily meet integration and operational requirements. The New Generation RVR should not be deployed until the deployment-critical issues detailed in this report are resolved and successfully retested. The principal concerns pertain to (1) personnel safety, (2) product integrity during an equipment failure, and (3) accuracy of the visibility product. It is further recommended that all regression testing take place using the RVR and MPS operational baseline software ... Runway Visual Range (RVR), Maintenance Processing System (MPS), Operational Test and Evaluation (OT and E), National Airspace System (NAS).


Runway Visual Range (RVR) Operational Test and Evaluation (OT & E) Integration and OT & E Operational Test Report
Language: en
Pages: 83
Authors: William E. Benner
Categories:
Type: BOOK - Published: 1993 - Publisher:

GET EBOOK

The Operational Test and Evaluation (OT and E) Integration and OT and E Operational testing of the Runway Visual Range (RVR) was conducted at the Kansas City In
Final Phase Runway Visual Range (RVR)/Automated Surface Observing System (ASOS) Interface Operational Test and Evaluation (OT & E) Report
Language: en
Pages: 0
Authors:
Categories:
Type: BOOK - Published: 1998 - Publisher:

GET EBOOK

This report summarizes results of Operational Test and Evaluation (OT & E) performed on the Final Phase Runway Visual Range (RVR) Automated Surface Observing Sy
New Generation Runway Visual Range (RVR) Final Operational Test and Evaluation Report
Language: en
Pages: 211
Authors:
Categories:
Type: BOOK - Published: 1996 - Publisher:

GET EBOOK

This report summarizes Operational Test and Evaluation (OT & E) activities for the New Generation Runway Visual Range (RVR) system. Testing consisted of an init
New Generation Runway Visual Range (RVR) Final Operational Test and Evaluation Report
Language: en
Pages: 63
Authors:
Categories:
Type: BOOK - Published: 1996 - Publisher:

GET EBOOK

This report summarizes Operational Test and Evaluation (OT & E) activities for the New Generation Runway Visual Range (RVR) system. Testing consisted of an init
Runway Visual Range (RVR) Operational Test and Evaluation (OT&E)
Language: en
Pages: 44
Authors: Joseph Goslin
Categories: Landing aides in air navigation
Type: BOOK - Published: 1991 - Publisher:

GET EBOOK